We have recently carried out an extensive demo and Builders Works package to two LIDL stores in the greater Birmingham areas of Bordesley Green and Winson Green, these projects were carried out concurrently and both were complete to our client’s specific programme and quality expectations.

Both stores required the removal of a large portion of their existing roof structures to enable the formation of a new shopfront and atrium entrance area which proved to be our most complex element of works on these projects. To ensure these works were carried out safely and efficiently we sought collective engagement of all the relevant bodies such as Site Team, Engineer, Health and Safety, Temporary Works Co-Ordinator and Crane Hire Company which ensured safe and swift removal of the structure.

During the construction build, we used a Porotherm block to build the bakery extension which benefits included safer, faster, more sustainable, and more thermally efficient building methods than we are traditionally used to all of which satisfied our client’s needs and demands.